Welcome to T&D Glazing and Installation Limited !!!

T&D Glazing and Installation Limited is a leading specialist in the installation of aluminium glazed building facades based in London but national resource.

Founded in 2003, our company has an average of 300 operatives who cover every skill set required by a company delivering every expectation of their client.

All our personnel are CSCS card holders and most hold specific certificates and licences.

Our portfolio of completed contracts and our regular customer base are evidence that we are getting it right.

If you wish to plan ahead in resourcing a new project, we would be happy to identify the availability of labour prior commencement.

We believe that ultimately, T&D Glazing and Installation success is driven by our customer's success. We ensure this by delivering only the highest quality installation.

Live Projects

Bishopsgate

Facade Installation

 

Stephenson House

 

Facade Installations

 

 

IQL S4 (International Quarter London Stratford 4)

Installation of stick curtain walling and unitised facades/ external glazing and cladding on a 22-storey high-rise building, including: Site Logistics, Setting Out, Glazing, Cladding, Builders Clean, Protection and Removal of the Protection at Project Practical Completion, project consisted of:

 

  • 16,500 of unitised facade
  • 1,200 of aluminium stick curtain walling, Reynaers system
  • glazed balustrades
  • rainscreen cladding and soffits
  • louvres

 

 

Work to do on the project/ Our responsibilities:

 

  • Pre-installation level and position survey of superstructure
  • Taking delivery of all materials (brackets, fixings, secondary materials, insulation, panels)
  • Installation and setting of the support brackets
  • Removal and disposal/ return of temporary protection and crates
  • Installation of façade (including stick system and GRC)
  • Completing the perimeter seal
  • Installation of copings, flashings, and balustrades
  • Dismantling and removing temporary edge protection & taking down to ground floor
  • Provision of as built surveys
  • Supply, Installation and maintenance of temporary protection. Materials to comply with LPS 1215
  • Installation of Firestop/ FIRAS accredited to perform and provide QA in accordance with the requirements of FIRAS and provide FIRAS conformance certificate

 

--------------------------------------------------------------------

Battersea Power Station Phase 3A

Facade Installations/ Glazing and Cladding, Building 1/ PP1:

 

  • Unitized System 7,256 m2
  • Fascia Spandrel, Cladding, Soffits, Cills 6,479 m2
  • Smoke & fire barriers at slab edge connection 2,656 m1
  • Fly-service brackets 906 no
  • Sliding Doors, Double Doors and Single Doors

 

 

Facade Installations/ Glazing and Cladding, Building 2/ PP2:

 

  • Unitized System 9,075 m2
  • Fascia Spandrel, Cladding, Soffits, Cills 6,605 m2
  • Smoke & fire barriers at slab edge connection 3,444 m1
  • Fly-service brackets 1,336 no
  • Sliding Doors, Double Doors and Single Doors

 

 

Facade Installations/ Glazing and Cladding, Podium:

 

  • Opaque and glazed steel Stick System elements 2,937 m2
  • Canopy steel structures, glazing and pipework
  • Cladding
  • Stainless Steel Gutter
  • Rainwater Pipes

 

150 Stratford Project

 

Cladding replacement works/ Recladding

 

  • 8,300 m2 of recladding on Block A/ Halo Tower
  • 310 m2 of recladding on Block B/ Warton House
  • 6,000 m2 o recladding on Block C, D & E/ Opal, Ruby & Amber Court
  • 1,800 m2 o recladding on Block F & G/ Sapphire Court
  • 1,350 Site Bending Panels
  • 542 Site Drilled Weep Holes in Panels (not slot holes)
  • 340 Balconies - Decking & Handrail

 

 

Acreditations