Expert Facade Installation by T&D Glazing

 

T&D Glazing specializes in the installation of high-quality building facades, cladding, windows, and curtain walling across the UK.

Based in London, we bring extensive experience and a dedicated team to every project, ensuring exceptional results for commercial and residential high-rise buildings.

 

Our Installation Expertise

We excel in the precise and efficient installation of:

  • Glazed Facades: Transform your building's appearance and energy efficiency with our expertly installed glazed facades. We work with premium materials to ensure lasting durability and performance for offices, retail spaces, and residential complexes.
  • Cladding: Enhance your building's thermal performance, weather resistance, and visual appeal with our professional cladding installation services. We specialize in advanced rainscreen cladding systems for optimal performance.
  • Windows and Doors: Our skilled installers ensure the perfect fit and finish for your chosen windows and doors. We install energy-efficient aluminium, timber, and composite options tailored to your project's needs.
  • Curtain Walling: We provide expert installation of both stick and unitised curtain wall systems, delivering strength, durability, and a modern design for high-rise and commercial buildings.

 

Why Choose T&D Glazing?

  • Skilled and Certified Installers: Our team comprises over 300 skilled and certified operatives, ensuring top-tier installations that meet the highest industry standards.
  • Client-Focused Approach: We prioritize client satisfaction by providing dedicated project management, clear communication, and a commitment to exceeding expectations.
  • Safety and Efficiency: We adhere to strict safety protocols and utilize proven installation methods to ensure efficient project completion and long-lasting results.

 

Comprehensive Project Management

From initial planning and logistics to on-site management and final inspection, we provide comprehensive project management to ensure seamless execution and timely delivery.

 

View Our Installation Portfolio

Explore our portfolio of successful projects and witness the quality of our installation expertise.

 

Contact Us Today

Ready to discuss your facade installation requirements? Contact us today to learn how T&D Glazing can contribute to your building's success.

Live Projects

Bishopsgate

Facade Installation

 

Stephenson House

 

Facade Installations

 

 

IQL S4 (International Quarter London Stratford 4)

Installation of stick curtain walling and unitised facades/ external glazing and cladding on a 22-storey high-rise building, including: Site Logistics, Setting Out, Glazing, Cladding, Builders Clean, Protection and Removal of the Protection at Project Practical Completion, project consisted of:

 

  • 16,500 of unitised facade
  • 1,200 of aluminium stick curtain walling, Reynaers system
  • glazed balustrades
  • rainscreen cladding and soffits
  • louvres

 

 

Work to do on the project/ Our responsibilities:

 

  • Pre-installation level and position survey of superstructure
  • Taking delivery of all materials (brackets, fixings, secondary materials, insulation, panels)
  • Installation and setting of the support brackets
  • Removal and disposal/ return of temporary protection and crates
  • Installation of façade (including stick system and GRC)
  • Completing the perimeter seal
  • Installation of copings, flashings, and balustrades
  • Dismantling and removing temporary edge protection & taking down to ground floor
  • Provision of as built surveys
  • Supply, Installation and maintenance of temporary protection. Materials to comply with LPS 1215
  • Installation of Firestop/ FIRAS accredited to perform and provide QA in accordance with the requirements of FIRAS and provide FIRAS conformance certificate

 

--------------------------------------------------------------------

Battersea Power Station Phase 3A

Facade Installations/ Glazing and Cladding, Building 1/ PP1:

 

  • Unitized System 7,256 m2
  • Fascia Spandrel, Cladding, Soffits, Cills 6,479 m2
  • Smoke & fire barriers at slab edge connection 2,656 m1
  • Fly-service brackets 906 no
  • Sliding Doors, Double Doors and Single Doors

 

 

Facade Installations/ Glazing and Cladding, Building 2/ PP2:

 

  • Unitized System 9,075 m2
  • Fascia Spandrel, Cladding, Soffits, Cills 6,605 m2
  • Smoke & fire barriers at slab edge connection 3,444 m1
  • Fly-service brackets 1,336 no
  • Sliding Doors, Double Doors and Single Doors

 

 

Facade Installations/ Glazing and Cladding, Podium:

 

  • Opaque and glazed steel Stick System elements 2,937 m2
  • Canopy steel structures, glazing and pipework
  • Cladding
  • Stainless Steel Gutter
  • Rainwater Pipes

 

150 Stratford Project

 

Cladding replacement works/ Recladding

 

  • 8,300 m2 of recladding on Block A/ Halo Tower
  • 310 m2 of recladding on Block B/ Warton House
  • 6,000 m2 o recladding on Block C, D & E/ Opal, Ruby & Amber Court
  • 1,800 m2 o recladding on Block F & G/ Sapphire Court
  • 1,350 Site Bending Panels
  • 542 Site Drilled Weep Holes in Panels (not slot holes)
  • 340 Balconies - Decking & Handrail

 

 

Acreditations