Welcome to T&D Glazing and Installation Limited !!!

At T&D Glazing and Installation Limited, we pride ourselves on being industry leaders in the installation of aluminium glazed building facades, cladding, windows, and curtain walling. Based in London, we offer our expert services nationwide, including for high-rise buildings, both commercial and residential.

 

Who We Are

Founded in 2003, T&D Glazing and Installation Limited has built a reputation for excellence and reliability. With a team of over 300 skilled operatives, we cover a comprehensive range of services required to meet and exceed our clients' expectations. Our operatives are all CSCS card holders, and many possess additional specialised certificates and licences.

 

Our Services

  • Glazed Facades: Enhancing the aesthetic and functional appeal of buildings with high-quality glazed facade installations.
  • Cladding: Providing durable and stylish cladding solutions that improve the appearance and performance of structures.
  • Windows and Doors: Expert installation of energy-efficient windows tailored to your project's specifications.
  • Curtain Walling: Advanced curtain walling systems that combine strength, durability, and modern design.
  • Site Management of Our Works: Professional oversight to ensure smooth and efficient execution of our installations.
  • Logistics of Our Works: Comprehensive logistical support to manage the delivery and handling of materials and equipment.
  • Labour, Staff, and Management Provider: Supplying skilled labour, staff, and management to support your project needs.

 

Why Choose Us

Our extensive portfolio of completed projects and a loyal customer base stand as a testament to our commitment to quality and customer satisfaction. We are dedicated to delivering top-notch installations that not only meet but exceed industry standards.

 

Plan Your Next Project with Us

Planning ahead is crucial for the success of any project. At T&D Glazing and Installation Limited, we offer assistance in identifying the availability of skilled labour to ensure your project commences on schedule and progresses smoothly.

 

Our Commitment

We believe that our success is intrinsically linked to the success of our clients. This drives us to deliver only the highest quality installations, ensuring that every project we undertake is completed to the utmost satisfaction of our clients.

Feel free to contact us to discuss your next project or to learn more about how T&D Glazing and Installation Limited can contribute to your success.

Live Projects

Bishopsgate

Facade Installation

 

Stephenson House

 

Facade Installations

 

 

IQL S4 (International Quarter London Stratford 4)

Installation of stick curtain walling and unitised facades/ external glazing and cladding on a 22-storey high-rise building, including: Site Logistics, Setting Out, Glazing, Cladding, Builders Clean, Protection and Removal of the Protection at Project Practical Completion, project consisted of:

 

  • 16,500 of unitised facade
  • 1,200 of aluminium stick curtain walling, Reynaers system
  • glazed balustrades
  • rainscreen cladding and soffits
  • louvres

 

 

Work to do on the project/ Our responsibilities:

 

  • Pre-installation level and position survey of superstructure
  • Taking delivery of all materials (brackets, fixings, secondary materials, insulation, panels)
  • Installation and setting of the support brackets
  • Removal and disposal/ return of temporary protection and crates
  • Installation of façade (including stick system and GRC)
  • Completing the perimeter seal
  • Installation of copings, flashings, and balustrades
  • Dismantling and removing temporary edge protection & taking down to ground floor
  • Provision of as built surveys
  • Supply, Installation and maintenance of temporary protection. Materials to comply with LPS 1215
  • Installation of Firestop/ FIRAS accredited to perform and provide QA in accordance with the requirements of FIRAS and provide FIRAS conformance certificate

 

--------------------------------------------------------------------

Battersea Power Station Phase 3A

Facade Installations/ Glazing and Cladding, Building 1/ PP1:

 

  • Unitized System 7,256 m2
  • Fascia Spandrel, Cladding, Soffits, Cills 6,479 m2
  • Smoke & fire barriers at slab edge connection 2,656 m1
  • Fly-service brackets 906 no
  • Sliding Doors, Double Doors and Single Doors

 

 

Facade Installations/ Glazing and Cladding, Building 2/ PP2:

 

  • Unitized System 9,075 m2
  • Fascia Spandrel, Cladding, Soffits, Cills 6,605 m2
  • Smoke & fire barriers at slab edge connection 3,444 m1
  • Fly-service brackets 1,336 no
  • Sliding Doors, Double Doors and Single Doors

 

 

Facade Installations/ Glazing and Cladding, Podium:

 

  • Opaque and glazed steel Stick System elements 2,937 m2
  • Canopy steel structures, glazing and pipework
  • Cladding
  • Stainless Steel Gutter
  • Rainwater Pipes

 

150 Stratford Project

 

Cladding replacement works/ Recladding

 

  • 8,300 m2 of recladding on Block A/ Halo Tower
  • 310 m2 of recladding on Block B/ Warton House
  • 6,000 m2 o recladding on Block C, D & E/ Opal, Ruby & Amber Court
  • 1,800 m2 o recladding on Block F & G/ Sapphire Court
  • 1,350 Site Bending Panels
  • 542 Site Drilled Weep Holes in Panels (not slot holes)
  • 340 Balconies - Decking & Handrail

 

 

Acreditations