150 Stratford Project

Project Location: 150 High Street, Stratford, London, E15 2GD
Main Contractor: Ardmore Construction Limited
Client: Ardmore Construction Limited
Start Date: Feb 2022
Finish Date: Dec 2023
Job Description: Cladding replacement works/ Recladding

IQL S4 (International Quarter London Stratford 4)

Project Location: The Holden Building, 5 Westfield Avenue, Stratford, London, E20 1HZ
Main Contractor: Lendlease Construction Limited
Client: Permasteelisa (UK) Limited
Start Date: Oct 2022
Finish Date: Dec 2023
Job Description: Installing facades / external glazing and cladding installation on a 22-storey high-rise building, including: Site Logistics, Setting Out, Glazing, Cladding, Builders Clean, Protection and Removal of the Protection at Project Practical Completion

Bishopsgate

Project Location: London
Main Contractor: Lendlease Construction Limited
Client: Permasteelisa (UK) Limited
Start Date: Aug 2022
Finish Date: Sep 2023
Job Description:

Stephenson House

Project Location: London
Main Contractor: Lendlease Construction Limited
Client: Permasteelisa (UK) Limited
Start Date: Apr 2020
Finish Date: Dec 2022
Job Description:

Battersea Power Station Phase 3A

Project Location: Kirtling Street, London, SW8 5BN
Main Contractor: Sir Robert McAlpine
Client: Permasteelisa (UK) Limited
Start Date: Sep 2020
Finish Date: Sep 2022
Job Description: Facade Installations/ Glazing and Cladding, Building 1/ PP1, Building 2/ PP2 and the podium

Plot 206 Greenwich Peninsula

Project Location: Riverside No. 206, Edmund Halley Way, North Greenwich, London, SE10 0ER
Main Contractor: MACE
Client: Permasteelisa (UK) Limited
Start Date: Oct 2017
Finish Date: Dec 2020
Job Description: Façade Installations BUILDING 3: - Unitized System 8,802 m2 - Unitized rain screen cladding 3,528 m2 Façade Installations BUILDING 4: - Unitized System 8,327 m2 - Unitized rain screen cladding 5,648 m2 Façade Installations BUILDING 5: - Unitized System 7,870 m2 - Unitized rain screen cladding 5,396 m2

City North Project - Finsbury Park, London, N4 3HH (18,000 m2 on BLOCK A, B, C & D)

Project Location: 113-115 Fonthill Road, Finsbury Park, London, N4 3HH
Main Contractor: Telford Homes
Client: TGM Façades UK Ltd.
Start Date: Mar 2018
Finish Date: Dec 2020
Job Description: 18,000m2 facade installation on 4 blocks (Block A, B, C and D)
Watch Video 1

Wardian Project - 163 Marsh Wall, Isle Of Dogs, London, E14 9TP (East Block, West Block and Podium)

Project Location: 163 Marsh Wall, Isle Of Dogs, London, E14 9TP
Main Contractor: Ballymore
Client: Sipral UK Limited
Start Date: Oct 2017
Finish Date: Dec 2020
Job Description: 35,000 m2 of facade installation (East Tower, West Tower and Podium)

Plot 205 Greenwich Peninsula

Project Location: Riverside No. 205, Edmund Halley Way, North Greenwich, London, SE10 0ER
Main Contractor: MACE
Client: Permasteelisa (UK) Limited
Start Date: Sep 2016
Finish Date: Nov 2018
Job Description: Façade Installations BUILDING 1: - Curtain Wall Stick System 1,527 m2 - Unitized System 10,910 m2 - Unitized rain screen cladding 3,270 m2 - Balcony screen 2,343 m2 - Balustrades 2,136 m2 - Balconies sliding doors 970 m2 - Copings 600 m1 Façade Installations BUILDING 2: - Curtain Wall Stick System 879 m2 - Unitized System 9,494 m2 - Unitized rain screen cladding 2,633 m2 - Balcony screen 1,616 m2 - Balustrades 2,136 m2 - Balconies sliding doors 668 m2 - Copings 560 m1

Angel Lane - Stratford

Project Location: Great Eastern Road, Stratford, London, E15 1BB
Main Contractor: Telford Homes
Client: TGM Façades UK Ltd.
Start Date: May 2016
Finish Date: Oct 2018
Job Description: 6,000m2 facade installation

Metal Balconies Assembling Team (Manager: Mr Eugeniu Rusu with 5-10 men)

Project Location: Enfield, London
Main Contractor: Paddington Construction
Client: Paddington Construction
Start Date: Feb 2014
Finish Date: Oct 2017
Job Description: Assembling balconies

Broadway Chambers

Project Location: 2 Broadway, Stratford, London, E14 4QS
Main Contractor: Telford Homes
Client: TGM FACADES
Start Date: Jun 2016
Finish Date: Sep 2017
Job Description: 12,000 m2 of facade installation

Plot 104 Greenwich Peninsula

Project Location: East Park Side, North Greenwich, London, SE10 0JF
Main Contractor: Wates Construction Site
Client: Permasteelisa (UK) Limited
Start Date: Aug 2015
Finish Date: Sep 2017
Job Description: Façade Installations: - Curtain Wall Stick System: 1,654 m2 - Unitized System: 9,501 m2 - Balconies: 94no - Cladding: a lot :)

TIQ S6

Project Location: International Quarter London, Westfield Avenue, Stratford, London, E20 1EJ
Main Contractor: Lendlease Construction Limited
Client: Permasteelisa (UK) Limited
Start Date: May 2016
Finish Date: Aug 2017
Job Description: Façade Installations: 15,000 m2 of Curtain Wall - Unitised System

Victoria's Secrets (Project Manager: Mr Iulian Danulet with a team of 6 men)

Project Location: White City Westfield Shopping Centre, London, W12 7GF
Main Contractor: Victoria Secrets
Client: Permasteelisa Interiors
Start Date: Aug 2015
Finish Date: Dec 2016
Job Description: Shop Front Installations

275 City Road (Project Manager: Mr Marius Ion Gheorghe with a team of 10-30 men)

Project Location: 257 City Road, London, EC1V 1LA
Main Contractor: Ardmore Construction Limited
Client: Ardmore Construction Limited
Start Date: Feb 2014
Finish Date: Nov 2016
Job Description: Installation of:Risers, Balcony's Stubs/ Brackets, GRC Panels/ Cladding, Balconies, Other steel structures

Block B & C, 375 Kensington High Street

Project Location: 375 High Kensington Street, London, W14 8QH
Main Contractor: St Edwards- Berkeley Group
Client: Martifer UK Limited/ www.martifer.com
Start Date: Jan 2014
Finish Date: Dec 2015
Job Description: Windows, stone, curtian wall

Block 5, One Tower Bridge

Project Location: Tooley Street, London, SE1 2HZ (Tower Bridge )
Main Contractor: Berkely Homes
Client: Scheldebouw B.V.
Start Date: Jun 2014
Finish Date: Dec 2015
Job Description: Facade Installations and Management: Curtain Wall Stick System 1,240m², Metal Rainscreens, Secondary Steel Suport and Bracketry

Premier House

Project Location: 112 Station Road, Edgware, London, HA8 7BJ
Main Contractor: South Coast Construction
Client: Harley Facades
Start Date: Apr 2015
Finish Date: Nov 2015
Job Description: Window Frames Rainscreen Metsec

Arora Apartaments

Project Location: Plot No. 301 (Adjacent Gate 1), Ordonance Crescent, Greenwich, SE10 0BB
Main Contractor: Balfour Beauty
Client: KYOTEC UK LTD
Start Date: Jun 2014
Finish Date: Oct 2015
Job Description: Façade Installations and Management: Unitized System Façade 6,500m², Copings, Windows, Curtain Wall

Stratford Plaza

Project Location: Station Street, Stratford, London E15 1AJ
Main Contractor: Telford Homes
Client: Oskomera Facades (UK) Ltd.
Start Date: Jan 2014
Finish Date: Jul 2015
Job Description: Façade Installations of: Facade Installations and Management; Unitized Elements; "Add On" Cladding "C" Channel, Cladding Brie-Soliel louvres, Aluminium cladding panels; Balustrades; Copings; Julliets; Steel Roof Structure; Roof louvres; Roof Cladding; Ground Floor Curtain Walling; Aluminium Soffits to Grd Floor; Renson louvres; Final Clean

Bradstowe House - HARROW

Project Location: Headstone Road/ 1 Junction Road, Harrow, London, HA1 1NL
Main Contractor: Comer Homers Group
Client: Harley Curtain Wall
Start Date: May 2014
Finish Date: Jul 2015
Job Description: Facade Installations: Curtain Wall, Windows

Cross Rail

Project Location: Canary Wharf, London, E14 4ED, (By West India DLR Station)
Main Contractor: Canary Wharf
Client: OAG
Start Date: Jun 2014
Finish Date: Jun 2015
Job Description: Installations of: Shop Front, Balustrade, Back Painted Glass, Sto Wall Lining, Smoke Buffles

Black Prince Road

Project Location: 81 Black Prince Road, Albert Embankment, London, SE1 7SZ
Main Contractor: Telford Homes
Client: Oskomera Facades (UK) Ltd.
Start Date: Aug 2013
Finish Date: Nov 2014
Job Description: Facade Installations and Management: Unitized Elements; Stone Cladding; Windows, Doors, Private Balconies; Curtain Wall; Balustrades; Privacy Balconies on terraces; Copings; Granite Plinth; Fascia Cladding Private Balconies; Aluminium soffits Private Balconies; Aluminium Cover RWP Private Balconies; Trespa cladding; Final Clean

Dickens Yard

Project Location: 2 New Broadway, Ealing, London, W5 2XA
Main Contractor: St. George
Client: Ardmore
Start Date: May 2014
Finish Date: Oct 2014
Job Description: Balconies Installations Flashings Other

Block A & D, 375 Kensington High Street

Project Location: 375 High Kensington Street, London, W14 8QH
Main Contractor: St Edwards- Berkeley Group
Client: Oskomera Facades (UK) Ltd.
Start Date: Apr 2012
Finish Date: Jun 2014
Job Description: Facade Installation: 3,145 m² Windows; 628 m² Curtain Wall; 44 m² Louvers; 420 m² Metsec; 623 m¹ Copings; 406 m¹ Balconies Balustrades; 174 m¹ Juliette Balustrade; 80 m² Metal Rainscreen Cassettes; 2,444 m² Stone Cladding; 609 m¹ Rain Water Pipes; 43 m² Privacy Screens;

Battersea Reach H & J

Project Location: York Road, Wandsworth, London, SW18 1TP
Main Contractor: St. George
Client: Oskomera Facades (UK) Ltd.
Start Date: Feb 2013
Finish Date: May 2014
Job Description: Façade Installations of: Curtain Wall, Stonework GRS, Balconies, Julliets, Balustrades, Privacy Screens, Copings, Brie Soleil, RWP - Rain Water Pipes, Tyvec Membrane, Canopies - North + Ramp Entry, Lights (Walking Lights), Lights (into to GRC), Lights (on brei soleils), MOV Roof Hutches/ Louvres, Soffits/ facias, Metal Pannels above CW, Euro Clading Rainscreen.

Langham Square

Project Location: 77-83 Upper Richmond Road, London, SW15 2TD
Main Contractor: St. James
Client: Oskomera Facades (UK) Ltd.
Start Date: Jan 2013
Finish Date: May 2014
Job Description: Façade Installations of: Windows, Louvres, Curtain Wall, Pressed Metal/ Trespa Pannels, Rainscreen, Rainscreen Flashing Curved Elevation NW and SE, Glazed Balustrades, Underside of Balconies – SOFFITS, Terracotta Baguettes / Installation only, NOT assembling, Copings, Flashings Cills on top of the Balustrade Upstand, Flashings Large Cills at the bottom of windows and trespa, Brie Soleil (By T&D only the curved elevation).

Battersea Reach F & G

Project Location: York Road, Wandsworth, London, SW18 1TP
Main Contractor: St. George
Client: Oskomera Facades (UK) Ltd.
Start Date: Jun 2011
Finish Date: Dec 2012
Job Description: Installtion of: 1996.22 m² curtain walling; 46.09 m² windows "shop fronts"; 1305.91 m² windows ( 242 windows; 490 m² terracotta cladding; 94.33 m² soffits; Internal and external COREX protection

Matchmakers Residential, A & B

Project Location: Telford Homes, Lesney Toys, Homerton Road, Hackney, London, E9 5TRHomerton Road, Hackney, London, E9 5TR
Main Contractor: Telford Homes
Client: Oskomera Facades (UK) Ltd.
Start Date: Feb 2011
Finish Date: Mar 2012
Job Description: Block A, 4005 m2 unitised system - elements, 84 m1 fins/steel structure, 58 m2 balconies, 80 No. sliding doors (glazing only), 133 m1 copings._____________Block B, 1783 m2 unitised system - elements, 53 m1 fins/steel structure, 14 m2 balconies, 44 No. sliding doors (glazing only,97 m1 copings.

Splendid Hotel

Project Location: Splendid Hotel, 24-28 Broadway, London, SW1H 0BH
Main Contractor: Broadock Construction
Client: Oskomera Facades (UK) Ltd.
Start Date: Mar 2011
Finish Date: Feb 2012
Job Description: Installation of windows frames and curtain walling

Creekside Residential , A & B

Project Location: Creekside Villlage West, 96-180 Creek Road Grenwich, London, SE8 3BZ
Main Contractor: Telford Homes
Client: Oskomera Facades (UK) Ltd.
Start Date: Feb 2011
Finish Date: Feb 2012
Job Description: Block A: 5,633 m2 unitised elements Block A: 443 m1 copings Block B: 4,897 m2 unitised elements Block B: aprox 500 m1 copings

Creekside Block A & B, Balconies and Balustrades

Project Location: Creekside Villlage West, 96-180 Creek Road, Grenwich, London, SE8 3BZ
Main Contractor: Telford Homes
Client: Hadham Engineering Ltd.
Start Date: Feb 2011
Finish Date: Jan 2012
Job Description: Block A, "Bolt On" and "Build Up" balconies, .... No.

N13, Athletes Village

Project Location: The Olimpics, Athletes Village, Stratford, London
Main Contractor: Galliford Try
Client: United AG
Start Date: Feb 2011
Finish Date: Sep 2011
Job Description: Installation of windows frames

Mayday Hospital

Project Location: Mayday University Hospital, 530 London Road, Thornton Heath, CR7 7YE
Main Contractor: Barclay Insurance
Client: Oskomera Facades (UK) Ltd.
Start Date: May 2011
Finish Date: Sep 2011
Job Description: Repairing doors and windows leaks.

Larnaca

Project Location: Grange Walk, Bermondsay, London, SE1 3EJ
Main Contractor: Ardmore Group
Client: United AG
Start Date: May 2011
Finish Date: Aug 2011
Job Description: Installation of windows frames and curtain walling

Bircherley Court

Project Location: Bircherley Court, Hertford, Herfordshire, SG14 1RL
Main Contractor: Hills Partnerships
Client: United AG
Start Date: Jun 2011
Finish Date: Jul 2011
Job Description: Installation of windows frames, curtain walling and doors.

Plashet Grove

Project Location: Pleshet Grove, East Ham, London, E6 1DA
Main Contractor: Hills Partnership
Client: United AG
Start Date: Jun 2011
Finish Date: Jul 2011
Job Description: Installation of Curtain Wall.

Battersea Reach Block S, Installing Pipes

Project Location: York Road, Wandsworth, London, SW18 1TP
Main Contractor: St George
Client: Oskomera Facades (UK) Ltd.
Start Date: Jun 2011
Finish Date: Jul 2011
Job Description: Installing water pipes from the roof to the ground. Apply silicone to windows. Making light boxes lights. Other (logistics)

Chynoweth Phase 1, Installing Solar Power Pannels

Project Location: Chynoweth, St. Allen, Troro, Cornwall, TR4 9DG
Main Contractor: Low Carbon Solar Limited
Client: Oskomera Solar Power Ltd.
Start Date: Jul 2011
Finish Date: Jul 2011
Job Description: Installing Solar Power Pannels.

Racetrack Silverstone

Project Location: Racetrack Silverstone, Dadford Road, Towcester, Luffield Abbey, Northamptonshire, NN12 8TN
Main Contractor: Racetrack Silverstone
Client: Montagebedrijf Herms-Pater B.V.
Start Date: May 2011
Finish Date: Jun 2011
Job Description: Installing steel.

Kings Cross

Project Location: Wharf Road (off York Road) Kings Cross, London, N1 0UZ
Main Contractor: Bam Construction / MERO-SCHMIDLIN
Client: RDI Architectural Limited
Start Date: Jun 2010
Finish Date: Jan 2011
Job Description: Installation/Glazing of Metal Arched Windows

N02, Athletes Village, Stratford, London

Project Location: Olympic Park, Stratford, London,
Main Contractor: The Ardmore Group
Client: Fleetwood Architectural Aluminium Limited
Start Date: Jul 2010
Finish Date: Jan 2011
Job Description: Installation of windows and doors. ______Frame repaired, reglazed and EPDM redone. This frames was previously installed by other Fleetwood Installation Company direct in the concret panel openings in the factory.

BBC West One

Project Location: Portland Place, London, W1A 1AA
Main Contractor: Bovis Land Lease
Client: Schneider (GB) Ltd.
Start Date: Feb 2009
Finish Date: Aug 2010
Job Description: 1,408.48 m2 Ribbon Windows - unitised 1,213.05 m2 Horizontal Capping - unitised 1,525.63 m2 Double Skin CW - unitised 301.27 m2 Staircases Glazing; 247.64 m2 Staircases Rainscreen; Smoke vents; Some logistics. 282.23 m2 Double Skin Projecting bay - unitised; Metal Works - handrails, copings, soffits, trims,
Watch Video 1 | Watch Video 2 | Watch Video 3 | Watch Video 4 | Watch Video 5

Creekside Block C & D, Balconies and Balustrades

Project Location: Creekside Villlage West, 96-180 Creek Road, Grenwich, London, SE8 3BZ
Main Contractor: Telford Homes
Client: Hadham Engineering Ltd.
Start Date: Jul 2009
Finish Date: Jul 2010
Job Description: Installed on Block D "Bolt On" and "Build Up" balconies, 103 No. and Balustrade, 450 m1______ Installed on Block C "Bolt On" and "Build Up" balconies, 93 No. and Balustrade, 480 m1_

Creekside Residential, C & D

Project Location: Creekside Villlage West, 96-180 Creek Road Grenwich, London, SE8 3BZ
Main Contractor: Telford Homes
Client: Oskomera Facades (UK) Ltd.
Start Date: Jul 2009
Finish Date: Jun 2010
Job Description: Installed on Block D 5,566 m2 unitised system - element and 432 m1 copings_________ Installed on Block C 4,698 m2 unitised system - elements and aprox 400 m1 copings.

The Balancing Barn The Suffolk

Project Location: Church Farm, Thorrington Lane, Thorrington, Halesworth, Suffolk, IP19 9JG
Main Contractor: MVRDV, Rotterdam NL.
Client: Oskomera Façades (UK) Ltd.
Start Date: Jan 2010
Finish Date: Feb 2010
Job Description: aprox. 200 m2 of Windows and Doors

Regents Place

Project Location: 14 - 26 High Street, Stratford, London, E15 2PP
Main Contractor: Bovis Land Lease
Client: Oskomera Facades (UK) Ltd.
Start Date: Aug 2008
Finish Date: Jan 2010
Job Description: 3000 m2 Alpha ScreenRainscreen (by AME Facades) Terracotta tiles maintenance

Battersea Reach

Project Location: York Road, Wandsworth, London, SW18 1TP
Main Contractor: St. George
Client: Schneider (GB) Ltd.
Start Date: Sep 2008
Finish Date: Mar 2009
Job Description: Installation/Glazing of Windows and Doors doors feature conopy unitised elements soffits copings and EPDM

Cooks Road

Project Location: 4 - 14 Graham Street, London, N1 8GB
Main Contractor: Telford Homes
Client: Oskomera Facades (UK) Ltd.
Start Date: Apr 2008
Finish Date: Feb 2009
Job Description: Windows and doors Balustrades Balconies Steel construction Aluminium rainscreens and copings

Altitude 25

Project Location: Hazledean Road, Croydon, London, CR9 5AA
Main Contractor: Haymills
Client: Oskomera Facades (UK) Ltd.
Start Date: Sep 2007
Finish Date: Dec 2008
Job Description: 5.100 m2 unitised façade 700 m2 curtain wall copings ducts & louvres brise soleils

Salamanca Place

Project Location: Salamanca Place, London, SE1 7SZ
Main Contractor: Berkeley Homes
Client: Oskomera Facades (UK) Ltd.
Start Date: Jul 2007
Finish Date: Aug 2008
Job Description: 650m2 precast concrete panels metsec windows 32 balconies

Tabard Square Curtain

Project Location: Empire Square, 34 Long Lane, London, SE1 4NH
Main Contractor: Bovis Land Lease
Client: Oskomera Facades (UK) Ltd.
Start Date: May 2008
Finish Date: Jul 2008
Job Description: 6.100 m2 unitised façade 3.000 m2 cladding 360 m2 louvres; copings 280 m2 windows and doors

City Road, London, 2007-08

Project Location: 4-14 Graham Street, London, N1 8GB
Main Contractor: City Wharf Development Co. Ltd.
Client: Oskomera Facades (Uk) Ltd.
Start Date: Jun 2007
Finish Date: Mar 2008
Job Description:

Yellow Box

Project Location: Kennington Lane, London, SE11 5QY
Main Contractor: McLaren Construction
Client: Oskomera Facades (UK) Ltd.
Start Date: Dec 2007
Finish Date: Feb 2008
Job Description: Installed 230 m2 of Stick Curtain Wall, 20 m2 of Glazed Reception Screen and Door and a Feature Canopy

High Street

Project Location: 14 - 26 High Street, Stratford, London, E17 2PP
Main Contractor: Telford Homes
Client: Oskomera Facades (UK) Ltd.
Start Date: Jun 2007
Finish Date: Jan 2008
Job Description: 5,701m2 unitised facades 81 m2 soffits 113 no bolt- on balonies with glass balustrade 24 no. privacy screens 96 m1 glazed balustrade

Warton Road Project, London 2006 - 2007

Project Location: Icona Point, 58 Warton Road, Stratford, London, E15 2JD
Main Contractor: Telford Homes
Client: Oskomera Facades (UK) Ltd.
Start Date: Jul 2006
Finish Date: May 2007
Job Description: Facade Installations/ Glazing and Cladding, Block A, B and C

Portsmouth Ariande

Project Location: Gun Wharf Quays, Portsmouth
Main Contractor: Berkeley Homes
Client: Oskomera Façades (UK) Ltd.
Start Date: Feb 2007
Finish Date: Mar 2007
Job Description: Glass Conopy

Tabard Square

Project Location: Empire Square, 34 Long Lane, London, SE1 4NH
Main Contractor: Berkely Homes / Laing O'Rourke
Client: Oskomera Facades (UK) Ltd.
Start Date: May 2005
Finish Date: Jan 2007
Job Description: 6.100 m2 unitised façade; 3.000 m2 cladding; 110 m2 curtain wall; 360 m2 louvres; copings; 280 m2 windows and doors; Maintenance (untill to August 2009);

Kent University

Project Location: The Medway Building Kent, ME4 4AG
Main Contractor: Whites
Client: Oskomera Façades (UK) Ltd.
Start Date: Mar 2006
Finish Date: Jun 2006
Job Description: 97 m2 curtain wall 206 m2 windows brise soleil the whole building Copings