IQL S4 (International Quarter London Stratford 4)
Main Contractor: Lendlease Construction Limited
Client: Permasteelisa (UK) Limited
Start Date: 11 October 2022
Finish Date: 21 December 2023
Installation of stick curtain walling and unitised facades/ external glazing and cladding on a 22-storey high-rise building, including: Site Logistics, Setting Out, Glazing, Cladding, Builders Clean, Protection and Removal of the Protection at Project Practical Completion, project consisted of:
- 16,500 of unitised facade
- 1,200 of aluminium stick curtain walling, Reynaers system
- glazed balustrades
- rainscreen cladding and soffits
- louvres
Work to do on the project/ Our responsibilities:
- Pre-installation level and position survey of superstructure
- Taking delivery of all materials (brackets, fixings, secondary materials, insulation, panels)
- Installation and setting of the support brackets
- Removal and disposal/ return of temporary protection and crates
- Installation of façade (including stick system and GRC)
- Completing the perimeter seal
- Installation of copings, flashings, and balustrades
- Dismantling and removing temporary edge protection & taking down to ground floor
- Provision of as built surveys
- Supply, Installation and maintenance of temporary protection. Materials to comply with LPS 1215
- Installation of Firestop/ FIRAS accredited to perform and provide QA in accordance with the requirements of FIRAS and provide FIRAS conformance certificate
--------------------------------------------------------------------