City North Project - Finsbury Park, London, N4 3HH (18,000 m2 on BLOCK A, B, C & D)
Main Contractor: Telford Homes
Client: TGM Façades UK Ltd.
Start Date: 21 March 2018
Finish Date: 10 December 2020
BLOCK A
3,773 m2 facade installation (unitised system)
76 m2 aluminium pannels into the unitised panels
5 m2 facade installation (windows)
945 m2 facade installation (Curtain Wall stick system)
1,221 lm/ m1 fire stop barier installation
BLOCK B
4,144 m2 facade installation (unitised system)
545 m2 facade installation (terracotta tiles)
1,677 m2 facade installation (Curtain Wall stick system)
1,856 lm/ m1 fire stop barier installation
BLOCK C
4,264 m2 facade installation (unitised system)
26 m2 aluminium pannels into the CW
1,203 m2 aluminium pannels into the unitised panels
49 m2 facade installation (windows)
1,616 m2 facade installation (Curtain Wall stick system)
292 m2 facade installation (Curtain Wall stick system plus fins)
1,460 lm/ m1 fire stop barier installation
BLOCK D
39 m2 aluminium pannels into the CW
0 m2 aluminium pannels into the unitised panels
8 m2 facade installation (windows)
365 m2 facade installation (Curtain Wall stick system)
342 m2 facade installation (Curtain Wall stick system plus fins)
242 lm/ m1 fire stop barier installation